| Rehabilitation of Tepa (Mabang) - Goaso Road (39.0km) BP-ONGOING-001 · Big Push | GHA Kofi Job Company Limited | GHS 554,679,293.69 | 12 Oct 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Ugrading of Akrodie – Sayereso Road (Km 20.0 – 44.0) BP-CONSOLIDATED-001 · Big Push | GHA Town & Concrete Properties Limited | GHS 453,143,852.21 | 1 Aug 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Bediako Junction - Camp 15 - Sefwi Adabokrom (55km) - Lot 1 BP-MAIN-001 · Big Push | GHA Delovely Company Limited | GHS 785,083,295 | 15 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Bediako Junction - Camp 15 - Sefwi Adabokrom (9.5km) - Lot 2 BP-MAIN-002 · Big Push | GHA Kingspok Construction Limited | GHS 135,594,474.05 | 15 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction Of Kumasi Outer Ring Road Project (15km) - Lot 1 BP-MAIN-005 · Big Push | DUR Arab Contractors Ghana Limited | GHS 1,029,969,450.51 | 25 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction Of Kumasi Outer Ring Road Project (15km) - Lot 2 BP-MAIN-004 · Big Push | DUR Arab Contractors Ghana Limited | GHS 1,029,969,450.51 | 31 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction Of Kumasi Outer Ring Road Project (15km) - Lot 3 BP-MAIN-003 · Big Push | DUR Arab Contractors Ghana Limited | GHS 1,031,413,200.51 | 24 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Design and Construction of Suame Interchange and Ancillary Works Component - Phase 1 BP-ONGOING-003 · Big Push | DUR Rango Construction Company Limited | USD 40,000,000 | 26 Oct 2022 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Design and Construction of Suame Interchange- Local Roads Component - Phase 2 BP-ONGOING-002 · Big Push | DUR Rango Construction Company Limited | EUR 140,000,000 | 25 Oct 2022 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Construction of Sunyani Outer Ring Road (17km) - Lot 1 BP-MAIN-007 · Big Push | DUR Kofi Job Company Limited | GHS 995,611,392.11 | 24 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction of Sunyani Outer Ring Road (17km) - Lot 2 BP-MAIN-006 · Big Push | DUR Kofi Job Company Limited | GHS 997,973,892.11 | 24 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Reconstruction of Jinijini - Sampa Road Project (80km) BP-ONGOING-004 · Big Push | GHA Rango Construction Company Limited | GHS 1,658,985,244.53 | 12 Nov 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Berekum - Seikwa Road (Km 0.65-34.1) BP-CONSOLIDATED-003 · Big Push | GHA J.A Adom Limited | GHS 339,830,873.53 | 12 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Sunyani – Atronie Road (Km 0+00 – 26+500) and Rehabilitation of Sunyani – Atronie Junction - Acherensua Road (Km 26+500 – Km 48+000) BP-CONSOLIDATED-002 · Big Push | GHA Alexiboam Company Limited | GHS 946,191,558.3 | 26 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Wenchi - Nsawkaw - Debibi - Sampa (0.00 - 31.60) BP-CONSOLIDATED-006 · Big Push | GHA Delovely Company Limited | GHS 273,057,871.1 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Wenchi - Nsawkaw - Debibi - Sampa (31.60 - 70.00) BP-CONSOLIDATED-005 · Big Push | GHA Town & Concrete Properties Limited | GHS 586,364,564.18 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Wenchi - Nsawkaw - Debibi - Sampa (70.00 - 90.00) BP-CONSOLIDATED-004 · Big Push | GHA Joshob Construction Limited | GHS 311,381,627.49 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Wenchi- Sawla Road (Km 0+000 - Km 25+000) BP-MAIN-009 · Big Push | GHA CIWE Ghana Engineering Limited | GHS 475,345,120.73 | 12 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Wenchi- Sawla Road (Km 25+000 - Km 50+000) BP-MAIN-010 · Big Push | GHA CIWE Ghana Engineering Limited | GHS 475,345,120.73 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Amoma - Agyina Feeder Road (6km) BP-CONSOLIDATED-013 · Big Push | DFR Ghamudar Development Limited | GHS 33,296,311.6 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Techiman - Nkonsia - Wenchi Road (32.6km) BP-MAIN-008 · Big Push | GHA Volta Impex | GHS 1,186,772,075.23 | 29 Nov 2024 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Apaaso Town roads (8.90km) BP-CONSOLIDATED-012 · Big Push | DFR Mountain Energy & Construction Limited | GHS 126,102,147.1 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Bodom - Senya- Bonte - Busunya Feeder Road (26.00km) BP-CONSOLIDATED-011 · Big Push | DFR Sandwell Sanders Limited | GHS 273,582,536 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Bono Manso - Kranka - Pinhin Feeder Road (16.00km) BP-CONSOLIDATED-010 · Big Push | DFR Ghamudar Development Limited | GHS 199,737,063.15 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Jema-Ampoma-Anyima Feeder Roads (17.00km) BP-CONSOLIDATED-014 · Big Push | DFR Mountain Energy & Construction Limited | GHS 58,610,942 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Jema-Town Roads (7.82km) BP-CONSOLIDATED-009 · Big Push | DFR Mountain Energy & Construction Limited | GHS 114,209,269.6 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Tankor - Fiema - Busunya Feeder Road (14.70km) BP-CONSOLIDATED-008 · Big Push | DFR Sandwell Sanders Limited | GHS 175,627,430.3 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Tanoboase - Kranka -Yefri Feeder Road (15.20km) BP-CONSOLIDATED-007 · Big Push | DFR Sandwell Sanders Limited | GHS 141,895,977.1 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Construction of Interchange at Winneba Roundabout (Km 28+200); 10 No. Footbridges; And Dualization into Winneba and Swedru Towns (4.0km) BP-MAIN-014 · Big Push | GHA Mo & Mo Company Limited | GHS 1,117,001,494.7 | 29 Aug 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Dualisation of Cape Coast- Takoradi Road (114 - 139km) BP-MAIN-015 · Big Push | GHA S&L Constructin andEngineering | GHS 3,104,632,933 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Dualisation of Winneba - Cape Coast Road (30 - 54 Km) BP-MAIN-012 · Big Push | GHA M.A & Constant Company | GHS 1,878,011,148 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Dualisation of Winneba - Cape Coast Road (54 - 79 Km) BP-MAIN-013 · Big Push | GHA M.A & Constant Company | GHS 3,860,486,565 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Partial Reconstruction of Essaman - Bantuma Road (4.5km) BP-CONSOLIDATED-030 · Big Push | DUR Mmanab Company Limited | GHS 84,628,218.68 | 12 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Reconstruction to Asphaltic Pavement of Komenda-Area Roads Ph. I (8.50km) BP-CONSOLIDATED-021 · Big Push | DFR R C Construction Limited | GHS 243,850,128.4 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Reconstruction to Asphaltic Pavement of Komenda-Area Roads Ph. II (21.82km) BP-CONSOLIDATED-022 · Big Push | DFR Nusta GB Prime Limited | GHS 572,616,818.47 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Reconstruction to Asphaltic Pavement of Komenda-Area Roads Ph. III (12.80km) BP-CONSOLIDATED-023 · Big Push | DFR West Brain Company Ghana Limited | GHS 323,986,561.92 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Reconstruction to Asphaltic Pavement of Komenda-Area Roads Ph. IV (11.24km) BP-CONSOLIDATED-024 · Big Push | DFR Yaskeem Limited | GHS 294,513,108.4 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation and Upgrading of Kasoa – Winneba Road (30.0km) - Lot 1A: Construction of Interchanges at Sapato (Km 1+800), Buduburam (Km 3+200) Awutu Breku (Km 7+200), Akoti (Km 9+800) and 2No. Footbridges BP-ONGOING-008 · Big Push | GHA NAG Fairmount Company Limited | USD 75,480,955.89 | 22 Dec 2023 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation and Upgrading of Kasoa – Winneba Road (30.Km) - Lot 2: Rehabilitation and Upgrading of Akoti Junction - Winneba Roundabout (Km 12.00 - 30.00) BP-ONGOING-007 · Big Push | GHA MM Delovely Company Limited | USD 85,237,300 | 22 Dec 2023 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation and Upgrading of Kasoa – Winneba Road (30.Km) - Lot 2A: Construction of Interchanges at Km 15+900 (Onion Market); Km 18+900 (Potsin); Twin River Bridge at Km BP-ONGOING-006 · Big Push | GHA MM Delovely Company Limited | USD 57,875,078.5 | 22 Dec 2023 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation and Upgrading of Kasoa Winneba Road (30km) Lot 1: Rehabilitation and Upgrading of Kasoa - Akoti Road (Km 0+000 – Km 12+000 BP-ONGOING-005 · Big Push | GHA NAG Fairmount Company Limited | USD 91,461,600 | 22 Dec 2023 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Abakrampa Junction - Abakrampa (6.80km) BP-CONSOLIDATED-029 · Big Push | DFR Maripoma Enterprise Limited | GHS 107,515,716.58 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Apam - Ankamu - Afranse Road (Km 6.8 -31) & Afranse Town Roads (4km: Total Length = 28.2Km BP-CONSOLIDATED-033 · Big Push | GHA General Construction & Development Limited | GHS 366,477,492.93 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Apam - Mumford - Hweda - Dago - Otuam Road (Km 0.0 - 15.0) BP-CONSOLIDATED-016 · Big Push | GHA Timeline & Innovations Company Ltd. | GHS 227,623,963.6 | 12 Oct 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Bisease and Kokoben Enclave Roads (26km) BP-CONSOLIDATED-032 · Big Push | GHA General Construction & Development Limited | GHS 338,303,241.64 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Eguase-Nkanfoa Road and Amosima Town Roads BP-CONSOLIDATED-028 · Big Push | DUR Halfast Company Limited | GHS 65,892,941.64 | 24 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Enyeme - Gomoa Oguaa - Ajumako Techiman Road (22.6Km BP-CONSOLIDATED-031 · Big Push | GHA General Construction & Development Limited | GHS 315,153,536.6 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of GNAT Junction to The Polykamp Hostel Area Roads, Cape Coast (7.78km) BP-CONSOLIDATED-027 · Big Push | DUR Serengeti Construction Limited | GHS 97,497,021.29 | 12 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Kafodzidzi Road to Aburansa Town, Ph 2 (4.8km) BP-CONSOLIDATED-026 · Big Push | DUR Ashcal Limited | GHS 54,961,893 | 12 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Kissi, Kwahenkrom to Kokoado Road (4.5km) BP-CONSOLIDATED-025 · Big Push | DUR Ashcal Limited | GHS 51,005,512.59 | 12 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Komenda Town Roads, Komenda (5.075km), PH 2 BP-CONSOLIDATED-020 · Big Push | DUR Kingspok Construction Limited | GHS 51,356,118.23 | 25 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Mankessim - Ajumako - Agona Swedru Road and Others Total Length = 111km BP-MAIN-011 · Big Push | GHA E - Speedway Construction Limited | GHS 2,890,514,550 | 30 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Selected Roads in Ajumako - Enyan - Essiam District (81.30 Km) BP-CONSOLIDATED-015 · Big Push | GHA Mo & Mo Company Limited | GHS 1,665,438,095.87 | 18 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of SSNIT Flats, Abinna, Atonkwa, Koful, Ahotokrom and Ntranoa Area Roads (7.17km) BP-CONSOLIDATED-019 · Big Push | DUR Ashcal Limited | GHS 78,187,193.95 | 12 Sept 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Asebu-Putubiw-Brimsu Water Works Feeder (12.00km) BP-CONSOLIDATED-018 · Big Push | DFR Tekie Construction Limited | GHS 178,609,157.16 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Besease-Anyinasu Feeder Road (17.50km) and Anyinasu Town Roads (2.50km) BP-CONSOLIDATED-017 · Big Push | DFR General Construction & Development Limited | GHS 236,153,771.01 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Construction of Adawso Bridge BP-MAIN-018 · Big Push | GHA SCL Sonitra Construction Limited | USD 497,664,217.34 | 30 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Atimpoku - Asikuma Junction (0-17.5km) BP-MAIN-019 · Big Push | GHA Ussuya (Gh) Limited | GHS 433,745,286.43 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Dome-Maame Krobo- Kwamepong Nkwanta Ph. I (km 60 + 000 - 115 + 000) BP-CONSOLIDATED-035 · Big Push | DFR Greenhouse Int. Development Gh. Ltd. | GHS 502,608,219.94 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Dome-Maame Krobo- Kwamepong Nkwanta Ph. II ( km 0 + 000 - 60 + 000) BP-CONSOLIDATED-034 · Big Push | DFR Bilqis International Development Ghana Limited | GHS 480,329,220.06 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Kwahu Tafo - Adawso Road (20.0km) And Kwahu Tafo Roads (5.0km) BP-CONSOLIDATED-036 · Big Push | GHA IB Maigida Limited | GHS 474,620,015.24 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Akosombo-Gyakiti-Kudikope Feeder Road (KM 8+000 - 31 + 600) and Yeniama Junction -Sedorm Feeder Road (8.40km) BP-MAIN-016 · Big Push | DFR Mmanab Company Limited | GHS 333,147,194 | 21 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Apeguso - Mpakadan Feeder Road (9.00Km) BP-MAIN-017 · Big Push | DFR Build Managers Limited | GHS 145,220,449.36 | 21 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Design Build for the Dualization of Adenta Dodowa Road (R40) - 22km BP-ONGOING-010 · Big Push | GHA Oswal Investments Limited | GHS 1,548,374,605.41 | 22 Mar 2024 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Reconstruction of Dodowa - Afienya-Dawhenya Road (0-24.80km) & Selected Town Roads 3.0km BP-MAIN-021 · Big Push | GHA Oswal Investments Limited | GHS 1,116,976,732.05 | 15 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Ofankor – Nsawam Road (Dual Carriageway) 33.0km BP-ONGOING-009 · Big Push | GHA Maripoma Enterprise Limited | USD 346,479,013.79 | 23 May 2022 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Selected Roads in Accra East BP-CONSOLIDATED-037 · Big Push | DUR Oswal Investments Limited | GHS 100,976,814.62 | 24 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Tema - Aflao Road (Km 1 - 18.30) BP-MAIN-020 · Big Push | GHA First Sky Limited | GHS 1,477,093,226.79 | 15 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading Of Oyibi-Appolonia-Afienya Road (21.0km) BP-MAIN-022 · Big Push | GHA Proslet | GHS 708,097,258.5 | 17 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Sege-Mepe Feeder Road (31.20km) BP-CONSOLIDATED-038 · Big Push | DFR Shenashe Limited | GHS 627,517,677.5 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Gbintri - Nakpanduri Road (44km) BP-MAIN-023 · Big Push | GHA Mawums Limited | GHS 1,038,241,891.2 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction of 3rd Ring Road, Tamale -Ph. 1 (11km) - Lot 1 BP-MAIN-026 · Big Push | DUR Sinohydro Corporation Lmited | GHS 873,575,035.81 | 22 Jan 2026 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction of 3rd Ring Road, Tamale -Ph. 1 (11km) - Lot 2 BP-MAIN-025 · Big Push | DUR China Railway No. 5 Engineering Group Limited | GHS 873,575,035.81 | 22 Jan 2026 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction of 3rd Ring Road, Tamale -Ph. 1 (11km) - Lot 3 BP-MAIN-024 · Big Push | DUR Munisco Limited | GHS 875,018,805.82 | 22 Jan 2026 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Saboba – Chereponi Road (Km 0.0 – 470) BP-CONSOLIDATED-040 · Big Push | GHA Fuzak Company Limited | GHS 316,888,260.48 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Saboba – Chereponi Road (Km 0.0 – 470) BP-CONSOLIDATED-039 · Big Push | GHA Fuzak Company Limited | GHS 427,767,985.13 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Construction of Dambai Bridge BP-MAIN-028 · Big Push | GHA Maripoma Enterprise Limited | GHS 3,989,560,929.14 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Reconstruction of Nkwanta – Dambai Road (Km 0+000 – 49+725) including 3.0Km Town Roads BP-CONSOLIDATED-061 · Big Push | GHA Eagle Star Enterprise Limited | GHS 804,824,456.81 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Dodo Pepesu - Nkwanta (46.40km) BP-MAIN-027 · Big Push | GHA Growth 82 Global Ltd. | GHS 683,902,957.69 | 31 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Hohoe-Baika-Jasikan and other Feeder Aroads (61.47km) BP-CONSOLIDATED-041 · Big Push | DFR Chriswed Limited | GHS 538,740,477.84 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Ketiajeli – Kitare Road (30Km) BP-CONSOLIDATED-042 · Big Push | GHA Akalifa’s Company Limited | GHS 369,320,343.93 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Nkwanta - Oti Damanko (0- 50.3km) BP-ONGOING-012 · Big Push | GHA China Jiangxi Engineering Ghana Limited | GHS 780,178,476.09 | 12 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Nkwanta - Oti Damanko (50.3km - 62km) BP-ONGOING-011 · Big Push | GHA China Jiangxi Engineering Ghana Limited | GHS 225,221,769.02 | 12 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Wenchi - Sawla (Km 100+000 - 125+000) Including Tinga Town Roads (3km) BP-MAIN-030 · Big Push | GHA China Railway No. 5 Engineering Group Limited | GHS 492,409,859.94 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Wenchi - Sawla (Km 125+000 - 150+000) BP-MAIN-029 · Big Push | GHA China Railway No. 5 Engineering Group Limited | GHS 448,383,080.79 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Wenchi - Sawla (Km 150+000 - 195+000) and Others (7km) BP-MAIN-031 · Big Push | GHA Maripoma Enterprise Limited | GHS 861,858,834.26 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Wenchi- Sawla Road (Km 50+000 - Km 75+000) BP-MAIN-032 · Big Push | GHA Polychanda Oversea Engineering Company Limited | GHS 423,613,808.58 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Wenchi- Sawla Road (Km 75+000 - Km 100+000) Including Bamboi (3km) And Banda Nkwanta (2km) Town Roads BP-MAIN-033 · Big Push | GHA Polychanda Oversea Engineering Company Limited | GHS 486,405,201.68 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Bole - Madari - Chache Road (35.5km) And Others (9km) BP-CONSOLIDATED-043 · Big Push | GHA Maripoma Enterprise Limited | GHS 649,103,309.06 | 28 Oct 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Partial Reconstruction of Navrongo - Tumu Road (27km) BP-MAIN-034 · Big Push | GHA Medmo Company Limited | GHS 360,107,867.58 | 11 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Partial Reconstruction of Navrongo Chuchuliga - Tumu Road; (34.23km) Including Partial Reconstructionof Navrongo Chuchuliga - Sandema Road (16km) BP-ONGOING-015 · Big Push | GHA Myturn Construction Limited | GHS 469,711,150.35 | 12 Nov 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Tumu - Chuchuliga - Navrongo (km 15-47) including construction of 36m span reinforced concrete bridge over Kanyibie River and 24m span reinforced concrete bridge over bechelihu river. - 32.6km BP-ONGOING-014 · Big Push | GHA Mawums Limited | GHS 598,002,009.04 | 10 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Tumu - Sissili - Navrongo Road (Km 0 - 15) BP-ONGOING-013 · Big Push | GHA Mawums Limited | GHS 254,180,205.58 | 10 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Construction of National Route N18 - Wa - Han Road (Km 54 - 76) BP-ONGOING-020 · Big Push | GHA P&W Ghanem Limited | GHS 159,447,053.75 | 11 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Wa - Han Road (Km 0 - 54) BP-MAIN-037 · Big Push | GHA Mo & Mo Company Limited | GHS 436,384,865.23 | 17 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Tumu - Hamile Road (Km 40.00 - 55.00) BP-MAIN-036 · Big Push | GHA M.A & Constant Company | GHS 207,969,054.78 | 17 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Tumu - Han - Lawra Road (Km 0 - 10) BP-MAIN-035 · Big Push | GHA Ghanhali Company Limited | GHS 207,969,054.78 | 17 Dec 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Tumu - Han - Lawra Road (Km 0 - 10) BP-ONGOING-019 · Big Push | GHA Ashcal Limited | GHS 159,449,928.43 | 11 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Tumu - Han - Lawra Road (Km 10 - 30) BP-ONGOING-018 · Big Push | GHA Maripoma Enterprise Limited | GHS 90,639,575.32 | 11 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Tumu - Han - Lawra Road (Km 30 - 45) BP-ONGOING-017 · Big Push | GHA Greenhouse Int. Development Gh. Ltd. | GHS 173,233,182.94 | 11 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Tumu - Han - Lawra Road (Km 45 - 70) BP-ONGOING-016 · Big Push | GHA P&W Ghanem Limited | GHS 421,701,612.5 | 11 Dec 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Wa – Bulenga – Yaala Road (Km 37 – 74) BP-CONSOLIDATED-044 · Big Push | GHA Astee Company Limited | GHS 542,044,533.04 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Reconstruction of Anyirawasi - Ho Tritrinu (Km 49.4 - 70.0), Ho (Guinness Deport) - Ho Airport 2nd Gate (Km 0-7.7) BP-MAIN-039 · Big Push | GHA First Sky Limited | GHS 1,525,609,304 | 15 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Reconstruction of Have - Hohoe Road (53km) (Completion of Outstanding Works) Including Critical Town and Access Roads (11.35km) and Construction of Alavanyo – Kpeme-Nkonya Tayi (Nkonsec) Road (3.6km) & Nkonya Ahenkro – Alavanyo Kpeme Road (2.8km) – Total Length = 70.75km BP-ONGOING-022 · Big Push | GHA Greenhouse Int. Development Gh. Ltd. | GHS 811,330,915.08 | 12 Nov 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabiliation of Atimpoku - Asikuma - Ho - Denu - Aflao Road (177Km) Rehabilitation of Asikuma Junction - Anyirawasi (Km 26.0 - 49.4) BP-MAIN-043 · Big Push | GHA Ultra Nexus Limited | GHS 634,061,351.78 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Afiadenyigba - Penyi Road (Km 62.60 - Km 76.60) Including Internal Link Roads Within Dzodze and Penyi Township (3km) BP-MAIN-046 · Big Push | GHA Timeline & Innovations Company Ltd. | GHS 367,904,784.34 | 28 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Afiadenyigba - Penyi Road (Km 76.60 - Km 85.0) Including Dualisation of Dzodze Town Road (3.5km) BP-MAIN-045 · Big Push | GHA Medmo Company Limited | GHS 441,304,080.92 | 12 Nov 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Anyirawase - Bame - Kpeve Road (Km 12.00 - Km 18.20) BP-CONSOLIDATED-045 · Big Push | GHA Bumecon Investment Limited | GHS 59,416,847.5 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Atimpoku - Asikuma Junction (17.5km - 26Km) BP-MAIN-047 · Big Push | GHA Dwawill Limited | GHS 210,843,969.63 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Ho - Kpetoe Road (Km 7.70 - Km 27.60) BP-MAIN-038 · Big Push | GHA China Railway No. 5 Engineering Group Limited | GHS 976,398,063.1 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Hohoe - Jasikan 30km BP-ONGOING-021 · Big Push | GHA Rolider Ghana Limited | GHS 489,359,153.2 | 12 Nov 2025 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Rehabilitation of Kpetoe - Aveafiadenyigba Road (Km 27+600 - Km 51+600) Including Ziope Towns Roads BP-MAIN-041 · Big Push | GHA Rolider Ghana Limited | GHS 545,928,621.25 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Kpetoe - Aveafiadenyigba Road (Km 51+600 - Km 62+600) Including Ziope Towns Roads BP-MAIN-042 · Big Push | GHA Timeline & Innovations Company Ltd. | GHS 250,302,362.02 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Penyi - Aflao (Km 85+000 - 107+000) BP-MAIN-040 · Big Push | GHA Medmo Company Limited | GHS 537,999,204.14 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Rehabilitation of Sokode - Juapong Road (Km 0.00 - Km 13.00) BP-CONSOLIDATED-053 · Big Push | GHA Fia Legacy Investment Limited Company | GHS 154,433,971.88 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Sokode - Juapong Road (Km 13.00 - Km 48.56) BP-CONSOLIDATED-052 · Big Push | GHA Bumecon Investment Limited | GHS 467,140,324.08 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Adaklu Tsrefe - Waya - Kayime Road (Km 0.0 - 32.30) and Abuadi - Kodiabe Road (2.0Km) BP-CONSOLIDATED-051 · Big Push | GHA Rolider Ghana Limited | GHS 468,949,757.2 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Bakpa Avedo - Dabala Jn. Feeder Road (11.30 Km) BP-CONSOLIDATED-048 · Big Push | DFR Berock Ventures | GHS 123,210,374 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Gonu Jn. - Sokladzi Jn. (9.70km) BP-CONSOLIDATED-047 · Big Push | DFR Berock Ventures | GHS 127,288,344.8 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Mafi Kumasi - Bakpa Avedo Feeder Roads (18.70 Km) BP-CONSOLIDATED-046 · Big Push | DFR Forgeline Company Limited | GHS 199,811,896.4 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Todome - Toh Kpalime - Dzemeni Feeder Road and Dzemeni Town Road (24.07KM) BP-MAIN-044 · Big Push | DFR Sanam Ghana Limited | GHS 300,291,294.94 | 17 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Waya - Asiekpe Road (23.6Km) including Construction of Waya Police Station - Hehekpoe Road (13Km) BP-CONSOLIDATED-050 · Big Push | GHA Rolider Ghana Limited | GHS 492,290,674.18 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Ziope - Torda Road (9.6Km) BP-CONSOLIDATED-049 · Big Push | GHA Rolider Ghana Limited | GHS 138,750,944.92 | 17 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Bitumen Surfacing of Gravel Yard - Baseke - Santasu Feeder Road Ph. I (Km 0.00-20.00) BP-CONSOLIDATED-056 · Big Push | DFR Top Engineering International Ltd. | GHS 171,202,944.6 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Construction of 1No. 3-Unit Classroom Block with Office, Staff Common Room, Storeroom and 6-Seater W/C Toilet at Tsintsimhwe WR/WEDA/WKS/015/25 · Education | Wassa East District Assembly ASANOC CONSTRUCTION LIMITED | Not reported | — Start: 28 Nov 2025 | Disclosed via CoST Sekondi-Takoradi, cost-stgh.org SDGs: 4 Quality Education, 5 Gender Equality, 6 Clean Water and Sanitation |
| Dualisation of Cape Coast- Takoradi Road (139- 164km) BP-MAIN-048 · Big Push | GHA Alkyro Jules Company Limited | GHS 2,509,998,661 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Dualisation of Cape Coast- Takoradi Road (164 - 187.6km) BP-MAIN-049 · Big Push | GHA S&L Constructin andEngineering | GHS 3,323,232,152 | 26 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Reconstruction of Atebabo - Centerso - Mumuni Junction Road (Km 0.00 - 28.00) BP-CONSOLIDATED-055 · Big Push | DFR Kingspok Construction Works Limited | GHS 309,462,094.3 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Essiama - Telekubokazo - Aniben Junction Road (Km 5.5 - 35.7) - Lot 3 BP-CONSOLIDATED-060 · Big Push | GHA Memphis Metropolitan Limited | GHS 232,550,433.09 | 30 Dec 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Rehabilitation of Essiama - Telekubokazo - Anyinase Road (Km 6.5 - 26.50) - Lot 6 BP-CONSOLIDATED-059 · Big Push | GHA Memphis Metropolitan Limited | GHS 444,615,011.59 | 30 Dec 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Takoradi - Agona Rehabilitation and Dualization of Takoradi – Agona Junction Road (23km) Including 2No. Dual Carriageway Bridges BP-ONGOING-023 · Big Push | GHA Justmoh Construction Limited | GHS 1,222,739,765 | 15 Feb 2024 Start: — | Source: supplied government project list — ON-GOING-BIG-PUSH-PROJECTS-.pdf |
| Upgrading of Asankragua -Agona Amenfi-Sefwi Bekwai (53.20km) BP-CONSOLIDATED-057 · Big Push | DFR Memphis Metropolitan Limited | GHS 362,035,484.8 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Asankragua-Fordjorkrom Ph. I (25.00km) BP-CONSOLIDATED-058 · Big Push | DFR Memphis Metropolitan Limited | GHS 210,492,952.38 | 21 Nov 2025 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Upgrading of Damang – Atieku – Twifo Anyinase Road (Km 0.0 – 41.0) and Daboase Junction – Atieku Road (Km 59.0 – 66.0) BP-CONSOLIDATED-054 · Big Push | GHA David Walter Limited | GHS 1,046,935,549.45 | 8 Jan 2026 Start: — | Source: supplied government project list — Consolidated-List.pdf |
| Construction of Dadieso - Akontombra Road (Km 4.0 - Km 26.30) BP-MAIN-052 · Big Push | GHA Kingspok Construction Limited | GHS 816,744,717.14 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Construction of Enchi - Elubo Road (71.25 Km) BP-MAIN-054 · Big Push | GHA Top Engineering International Ltd. | GHS 1,414,219,012.69 | 29 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Adwofua-Oseikojokrom Road Road (Km16-41) BP-MAIN-051 · Big Push | GHA Cymain Ghana Limited | GHS 390,077,209 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Enchi - Kudjouru - Pekyi (Km 0.00 - Km30.00) BP-MAIN-053 · Big Push | GHA Maripoma Enterprise Limited | GHS 410,236,050.39 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |
| Upgrading of Enchi - Kudjouru - Pekyi (Km30.00 - Km 62.00) BP-MAIN-050 · Big Push | GHA Big Aidoo Construction Limited | GHS 469,040,715.45 | 18 Sept 2025 Start: — | Source: supplied government project list — Main-Big-Push-Projects.pdf |