BP-MAIN-019 · Roads
Rehabilitation of Atimpoku - Asikuma Junction (0-17.5km)
Atimpoku, Asuogyaman, Eastern · 6.2031, 0.0817 (approximate)
Big Push
- Executing agency
- GHA
- Contractor
- Ussuya (Gh) Limited
- Road length
- 17.5 km
- Contract sum
- GHS 433,745,286.43
- Award date
- 18 Sept 2025
- Official progress period
- March → April (chart estimate; year not specified)
- Previous official progress
- 30% (March)
Real · Official disclosure
Source: supplied government project list — Main-Big-Push-Projects.pdfRegistered from supplied government project list · Official progress 31%. No inspection approved by this app is implied.
- source page
- 3
- source entry
- 19
- progress note
- March / April chart reading, rounded to whole percentages; approximate ±1 percentage point. Reporting year not specified. Not field verification.
- source regions
- Eastern / Volta
- progress source
- Screenshot_2026-11-02_162146.png
- source document
- Main-Big-Push-Projects.pdf
- registration note
- Source-list entry; road corridors may cross districts. Requires agent assignment and field inspection.
Approximate locality point for Atimpoku, Asuogyaman; GeoNames Ghana gazetteer, geonameid 7648614 (https://www.geonames.org/7648614). Locality anchor only, not surveyed road alignment or exact chainage. Source region label(s) preserved in source record: Eastern, Volta. Single representative district assignment does not assert exclusive project coverage; source cross-region/OCR labels are not corrected here. Representative assignment does not assert exclusive project coverage or locate the stated chainage exactly.
Project profileTimeline
- Started
- —
- Expected completion
- —
- Contract completion date
- —
Loading site photos…